1 126869 28.02.1900.011.51.016.17/506 Fabrication & Installation of a IP-DRS and Hook-up of Feni Town Gas Pipeline Chowddagram Gas Pipeline Maijdee Lateral Line and Doreen Power Plant Gas Pipeline with newly constructed Feni TBS in Feni. 31-10-2017 & 23:59 01-11-2017 & 12:30 01-11-2017 & 12:30 Download -
2 119177 28.02.1900.011.51.017.17/429 Hook-up work of Comilla Lateral Line and Summit Power Line with newly constructed Kutumbapur TBS due to up-gradation of Kutumbapur TBS by GTCL in Kutumbapur, Comilla. 24-09-2017 & 23:59 25-09-2017 & 12:30 25-09-2017 & 12:30 Download -
3 114787 28.02.1900.011.71.001.17/505 Emergency Pipeline Maintenance works such as removal of service line, re-instatement, welding of 3/4 inch, 1 inch, 2 inch and 3 inch diameter at Brahmanbaria, Ashugonj and Sarail Areas. 27-08-2017 & 17:00 28-08-2017 & 12:05 28-08-2017 & 12:05 Download -
4 112092 28.02.1900.011.51.526.17 Installation of a Filtering & Metering Station (FMS) and Construction of a gas pipeline of dia. 8 inch & pressure 150 psig and length 980 metre from Well No. 2 of Shahajadpur-Sundalpur gas field to Habibpur, Companygonj, Noakhali. 16-08-2017 & 23:59 17-08-2017 & 12:00 17-08-2017 & 12:00 Download -
5 111276 28.02.1900.011.51.016.17 Hook-up work of Comilla Lateral and Summit Power Line with newly constructed Kutumbapur TBS due to up-gradation of Kutumbapur TBS by GTCL in Kutumbapur, Comilla. 09-08-2017 & 23:59 10-08-2017 & 12:00 10-08-2017 & 12:00 Download -
6 91935 28.02.1900.011.71.001.17 Emergency Pipeline Maintenance works of different diameter at Comilla Adarsha Sadar, Sadar Dakkhin, Burichang, Chouddogram, Chandina, Laksham & Barura Upazilla Areas (2016-2017) 10-04-2017 & 17:00 11-04-2017 & 12:05 11-04-2017 & 12:30 Download -
7 90115 28.02.1900.011.51.006.17/121 Construction of 4 inch dia 403 Meter, 66 Barg High Pressure inlet pipeline of TBS-cum-DRS in Bakhrabad Gas Field. 29-03-2017 & 17:00 30-03-2017 & 12:05 30-03-2017 & 12:30 Download -
8 85911 28.02.1900.011.62.120.17 Construction of 8 inch dia 23 KM. 360 Psig Pilpeline from Bizra off-take Point at BKB-CTG gas Transmission line to Comilla EPZ and 8 inch dia 4 KM. 150 Psig pipeline at Comilla EPZ with necessary Hook-up work and Fabrication, Installation & Commissioning of a HP-DRS of capacity 25 MMSCFD at Comilla EPZ with supply of some fittings/parts. 19-03-2017 & 17:00 20-03-2017 & 12:00 20-03-2017 & 12:30 Download -
9 83516 (Re-Tender) 28.02.1900.011.51.024.16 Re-Construction of 10ˮφ,147 Meter,66 barg high pressure Transmission Pipe Line at Salda & Goongur River crossing of BKB- SALDA Gas Transmission Line in Konaghata Near Salda. 07-02-2017 & 17:00 08-02-2017 & 12:05 08-02-2017 & 12:30 Download -
10 81247 28.02.1900.011.51.001.16 Modification, Testing & Commissioning of One run of Bijra TBS in Comilla, Two runs of Chandpur 150 MW TBS & Two runs of Chandpur HP-DRS in Chandpur TBS. 31-01-2017 & 17:00 01-02-2017 & 12:05 01-02-2017 & 12:30 Download -